PP-0138: Commission chilled water plant after insulation completion

Task Details

taskIdPP-0138
sourcePlant Head Email
workstreamUtility
areaUtility Yard / Pilot Plant
equipmentSystemChilled Water Plant
capacitySize
activityCategoryCommissioning
readinessGateCommissioning
activityDescriptionCommission chilled water plant after insulation completion
currentStatusNot Started
dashboardBucketNot Started
priorityCritical
ownerDepartmentEngineering / Utility
responsiblePerson
vendorAgencyUtility Vendor
targetCompletionDate
revisedTargetDate
actualCompletionDate
dependencyPredecessorChilled Water Plant insulation completion
blockertrue
blockingImpactedItemsGLR / SSR / condenser / clean room commissioning readiness
commissioningImpacttrue
qualificationImpacttrue
evidenceAcceptanceCriteriaCommissioning report with flow, temperature and load trial results.
remarksNextAction
lastUpdatedOn
updatedBy
daysToTarget
scheduleFlagBlocked
completionPercent0
criticalBlockerThemeInsulation

Stakeholder Task Update

Updates require DATA_SOURCE=supabase. CSV mode remains read-only.

No login is required for this pilot flow. Updates are submitted to server-side Supabase operations only and each saved change creates a task_updates audit row.

Blocked By / Upstream Tasks

Dependency-blocked status is derived from predecessor task completion and is separate from the manual blocker flag.

No upstream task dependencies are mapped for this task.

Blocking / Downstream Tasks

No downstream task dependencies are mapped for this task.

Recent Update History

Update history is available when DATA_SOURCE=supabase is enabled. CSV mode remains read-only.