Master Task Register

Filter/search by task code, description, workstream, area, equipment, status, priority, owner, vendor, manual blocker, task dependency, and impact fields. CSV export preserves seed core columns.

Data source: CSV — CSV fallback active because Supabase read failed. Unable to read Supabase tasks: TypeError: fetch failed

Export filtered CSVClear filtersDashboard

Showing Equipment: GLR-201 — 8 of 241 tasks

TaskWorkstreamAreaEquipmentDescriptionStatusPriorityOwnerTargetManual BlockerDependency BlockedBlocked ByBlockingC ImpactQ Impact
PP-0055EquipmentIntermediateGLR-201Receive and install glass-lined reactor in final positionClosedHighEngineering
Unassigned
No TargetNoNo00NoNo
PP-0056EquipmentIntermediateGLR-201Fix and verify GLR bottom valveNot StartedCriticalEngineering
Unassigned
2026-07-22YesNo00YesYes
PP-0057UtilityIntermediateGLR-201Complete vacuum connection to GLRPO Under ProcessCriticalEngineering / Procurement
Unassigned
No TargetYesNo00YesYes
PP-0058Safety / EHSIntermediateGLR-201Complete scrubber / vent connection to GLRPO Under ProcessCriticalEngineering / Procurement
Unassigned
No TargetYesNo00YesYes
PP-0059UtilityIntermediateGLR-201Complete hot water connection to GLR jacket / coilNot StartedCriticalEngineering
Unassigned
No TargetYesNo00YesYes
PP-0060EquipmentIntermediateGLR-201Install and fix glass condensing system / condenserNot StartedCriticalEngineering
Unassigned
2026-07-22YesNo01YesYes
PP-0061EquipmentIntermediateGLR-201Execute GLR installation checklist and no-load commissioning trialNot StartedCriticalEngineering / Production
Unassigned
No TargetYesYes11YesYes
PP-0062QualificationIntermediateGLR-201Prepare and execute IQ/OQ package for GLRNot StartedHighQA / Validation
Unassigned
No TargetNoYes10NoYes

Imported columns supported: 31. Closed and qualified tasks remain visible unless an open-only filter is selected.