Master Task Register

Filter/search by task code, description, workstream, area, equipment, status, priority, owner, vendor, manual blocker, task dependency, and impact fields. CSV export preserves seed core columns.

Data source: Supabase

Export filtered CSVClear filtersDashboard

Showing Area: Utility Yard / Pilot Plant16 of 241 tasks

TaskWorkstreamAreaEquipmentDescriptionStatusPriorityOwnerTargetManual BlockerDependency BlockedBlocked ByBlockingC ImpactQ Impact
PP-0135UtilityUtility Yard / Pilot PlantChilled Water PlantVerify chilled water plant received, installed and positionedClosedHighEngineering
Unassigned
No TargetNoNo00NoNo
PP-0136UtilityUtility Yard / Pilot PlantChilled Water PlantVerify primary pump, hot well/cold well and header connections for chilled water plantLeak Test DoneHighEngineering
Unassigned
No TargetNoNo00YesNo
PP-0137UtilityUtility Yard / Pilot PlantChilled Water PlantComplete insulation for chilled water plant piping and headersPO Under ProcessCriticalEngineering / Procurement
Unassigned
No TargetYesNo00YesYes
PP-0138UtilityUtility Yard / Pilot PlantChilled Water PlantCommission chilled water plant after insulation completionNot StartedCriticalEngineering / Utility
Unassigned
No TargetYesNo00YesYes
PP-0139UtilityUtility Yard / Pilot PlantChilled Water PlantPerform temperature achievement, circulation and load verification for chilled water plantNot StartedHighEngineering / Utility
Unassigned
No TargetNoNo00YesYes
PP-0140UtilityUtility Yard / Pilot PlantChilled Brine PlantVerify chilled brine plant received, installed and positionedClosedHighEngineering
Unassigned
No TargetNoNo00NoNo
PP-0141UtilityUtility Yard / Pilot PlantChilled Brine PlantVerify primary pump, hot well/cold well and header connections for chilled brine plantClosedHighEngineering
Unassigned
No TargetNoNo00YesNo
PP-0142UtilityUtility Yard / Pilot PlantChilled Brine PlantComplete insulation for chilled brine plant piping and headersWork In ProgressCriticalVendor
Ravi Insulations
2026-07-30YesNo00YesYes
PP-0143UtilityUtility Yard / Pilot PlantChilled Brine PlantCommission chilled brine plant after insulation completionUnder DiscussionCriticalVendor
Cooling people
2026-07-21YesNo00YesYes
PP-0144UtilityUtility Yard / Pilot PlantChilled Brine PlantPerform temperature achievement, circulation and load verification for chilled brine plantUnder DiscussionHighVendor
Cooling people
2026-07-21NoNo00YesYes
PP-0145UtilityUtility Yard / Pilot PlantCooling TowersVerify cooling tower installation and pipeline connectionsWork In ProgressHighEngineering / Utility
Mr.Sharma Ji
2026-07-25NoNo00YesNo
PP-0146UtilityUtility Yard / Pilot PlantCooling TowersComplete cooling tower fan rotation, circulation trial, make-up water and blowdown checksWork In ProgressHighEngineering
Mr.Sharma Ji
2026-07-25NoNo00YesNo
PP-0147UtilityUtility Yard / Pilot PlantHot Water SystemVerify hot water system received at siteClosedHighEngineering
Unassigned
No TargetNoNo00NoNo
PP-0148UtilityUtility Yard / Pilot PlantHot Water SystemStart and complete hot water system installation by Amir TanksClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0149UtilityUtility Yard / Pilot PlantHot Water SystemComplete hot water circulation pipeline connections and insulationWork In ProgressCriticalEngineering
Mr.Sharma Ji
2026-07-28YesNo00YesYes
PP-0150UtilityUtility Yard / Pilot PlantHot Water SystemCommission hot water system and verify temperature / circulation performanceNot StartedCriticalVendor
Amir Tanks
2026-07-31YesNo00YesYes

Imported columns supported: 31. Closed and qualified tasks remain visible unless an open-only filter is selected.