Pilot Plant TrackerChecking session…

Master Task Register

Filter/search by task code, description, workstream, area, equipment, status, priority, owner, vendor, manual blocker, task dependency, and impact fields. CSV export preserves seed core columns.

Data source: Supabase

Export filtered CSVClear filtersDashboard

Showing Tasks With No Target Date — 69 of 241 tasks

TaskWorkstreamAreaEquipmentDescriptionStatusPriorityOwnerTargetManual BlockerDependency BlockedBlocked ByBlockingC ImpactQ Impact
PP-0001EquipmentIntermediateSSR-201Receive and install stainless steel reactor in final positionClosedHighVendor
Amir Tanks
No TargetNoNo00NoNo
PP-0006UtilityIntermediateSSR-201Complete hot water connection to reactor jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetNoNo01YesYes
PP-0010EquipmentIntermediateSSR-202Receive and install stainless steel reactor in final positionClosedHighEngineering
Amir Tanks
No TargetNoNo00NoNo
PP-0015UtilityIntermediateSSR-202Complete hot water connection to reactor jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetNoNo00YesYes
PP-0019EquipmentIntermediateSSR-203Receive and install stainless steel reactor in final positionClosedHighEngineering
Amir Tanks
No TargetNoNo00NoNo
PP-0024UtilityIntermediateSSR-203Complete hot water connection to reactor jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetNoNo00YesYes
PP-0028EquipmentIntermediateSSR-204Receive and install stainless steel reactor in final positionClosedHighEngineering
Amir Tanks
No TargetNoNo00NoNo
PP-0033UtilityIntermediateSSR-204Complete hot water connection to reactor jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetNoNo00YesYes
PP-0037EquipmentIntermediateSSR-205Receive and install stainless steel reactor in final positionClosedHighEngineering
Amir Tanks
No TargetNoNo00NoNo
PP-0042UtilityIntermediateSSR-205Complete hot water connection to reactor jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetNoNo00YesYes
PP-0046EquipmentClean roomSSR-206Receive and install stainless steel reactor in final positionClosedHighEngineering
Amir Tanks
No TargetNoNo00NoNo
PP-0051UtilityClean roomSSR-206Complete hot water connection to reactor jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetNoNo00YesYes
PP-0055EquipmentIntermediateGLR-201Receive and install glass-lined reactor in final positionClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0059UtilityIntermediateGLR-201Complete hot water connection to GLR jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0063EquipmentIntermediateGLR-202Receive and install glass-lined reactor in final positionClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0067UtilityIntermediateGLR-202Complete hot water connection to GLR jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0071EquipmentIntermediateGLR-203Receive and install glass-lined reactor in final positionClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0075UtilityIntermediateGLR-203Complete hot water connection to GLR jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0079EquipmentIntermediateGLR-204Receive and install glass-lined reactor in final positionClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0083UtilityIntermediateGLR-204Complete hot water connection to GLR jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0087EquipmentClean roomGLR-205Receive and install glass-lined reactor in final positionClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0091UtilityClean roomGLR-205Complete hot water connection to GLR jacket / coilClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0117AreaClean roomPackaging areaComplete flooring workClosedHighEngineering
Mr.Sharma
No TargetNoNo00YesYes
PP-0118Electrical / InstrumentationClean roomPackaging areaComplete electrical connectionsClosedHighElectrical / Instrumentation
Mr.Sharma
No TargetNoNo00YesYes
PP-0121AreaIntermediateMilling and sifting areaComplete flooring workClosedHighEngineering
Mr.Sharma Ji / Vendor
No TargetNoNo00YesNo
PP-0125AreaIntermediateIntermediate storage areaComplete flooring workClosedHighEngineering
Mr.Sharma Ji
No TargetNoNo00YesNo
PP-0129Safety / EHSIntermediateMezzanine floorComplete man movement pathwayClosedCriticalEngineering / EHS
Mr.Sharma Ji
No TargetNoNo00YesNo
PP-0134Electrical / InstrumentationPilot plantLayer separation lampProvide electrical lamps for layer separationsClosedMediumElectrical / Instrumentation
Mr.Sharma Ji
No TargetNoNo00YesNo
PP-0135UtilityUtility Yard / Pilot PlantChilled Water PlantVerify chilled water plant received, installed and positionedClosedHighEngineering
Mr.Sharma Ji / Vendor
No TargetNoNo00NoNo
PP-0136UtilityUtility Yard / Pilot PlantChilled Water PlantVerify primary pump, hot well/cold well and header connections for chilled water plantClosedHighEngineering
Mr.Sharma Ji
No TargetNoNo00YesNo
PP-0140UtilityUtility Yard / Pilot PlantChilled Brine PlantVerify chilled brine plant received, installed and positionedClosedHighEngineering
Mr.Sharma Ji / Vendor
No TargetNoNo00NoNo
PP-0141UtilityUtility Yard / Pilot PlantChilled Brine PlantVerify primary pump, hot well/cold well and header connections for chilled brine plantClosedHighEngineering
Mr.Sharma Ji / Vendor
No TargetNoNo00YesNo
PP-0147UtilityUtility Yard / Pilot PlantHot Water SystemVerify hot water system received at siteClosedHighEngineering
Amir Tanks
No TargetNoNo00NoNo
PP-0148UtilityUtility Yard / Pilot PlantHot Water SystemStart and complete hot water system installation by Amir TanksClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0151UtilityPilot plantUtility Manifold - SS ReactorsVerify fabrication completion for utility manifold - ss reactorsClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0154UtilityPilot plantUtility Manifold - GL ReactorsVerify fabrication completion for utility manifold - gl reactorsClosedHighEngineering
Mr.Sharma Ji
No TargetNoNo00NoNo
PP-0156DocumentationPilot plantUtility Manifold - GL ReactorsUpdate as-built drawing for utility manifold - gl reactorsNot StartedHighEngineering
Mr.Sharma
No TargetNoYes10NoYes
PP-0157UtilityPilot plantUtility Manifold - Clean Room ReactorsVerify fabrication completion for utility manifold - clean room reactorsClosedHighEngineering
Mr.Sharma
No TargetNoNo00NoNo
PP-0159DocumentationPilot plantUtility Manifold - Clean Room ReactorsUpdate as-built drawing for utility manifold - clean room reactorsNot StartedHighEngineering
Mr.Sharma
No TargetNoNo00NoYes
PP-0160UtilityPilot plantLow Vacuum SystemFinalize estimate and scope for low vacuum system piping procurementClosedCriticalEngineering / Procurement
Mr.Sharma Ji / Mr.Santosh
No TargetYesNo00YesYes
PP-0161UtilityPilot plantLow Vacuum SystemIssue PO and receive materials for low vacuum systemClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0164UtilityPilot plantHigh Vacuum SystemFinalize estimate and scope for high vacuum system piping procurementClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0165UtilityPilot plantHigh Vacuum SystemIssue PO and receive materials for high vacuum systemClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0175HVAC / Clean RoomClean roomHVAC SystemPerform duct leakage testClosedHighVendor
Pradham HVAC
No TargetYesNo00YesYes
PP-0181Electrical / InstrumentationPilot plantElectrical DistributionVerify major electrical connections and reactor push buttonsClosedHighEngineering
Mr.Sharma Ji
No TargetNoNo00YesYes
PP-0184Electrical / InstrumentationPilot plantElectrical DistributionVerify equipment-wise earthing and bondingClosedCriticalEngineering
Mr.Sharma Ji
No TargetYesNo00YesYes
PP-0187Electrical / InstrumentationPilot plantInstrumentationTest alarms, interlocks and emergency stopsNot StartedCriticalElectrical / Instrumentation
Mr.Sharma Ji / Vendor
No TargetYesNo00YesYes
PP-0188HydrogenationHydrogenation AreaHydrogen Reactor 250 LVerify 250 L hydrogen reactor installationClosedCriticalEngineering
Amir Tanks
No TargetNoNo00YesYes
PP-0199HydrogenationHydrogenation AreaHydrogenation AreaComplete EHS pre-startup safety review for hydrogenationNot StartedCriticalEHS
Production / Safety
No TargetYesNo00YesYes
PP-0203DocumentationPilot plantArea & GMP LayoutFreeze equipment layout with final equipment positionsClosedCriticalEngineering / QA / EHS
All Departments
No TargetYesNo00YesYes
PP-0204DocumentationPilot plantArea & GMP LayoutPrepare GMP-compliant material movement flowClosedCriticalEngineering / QA / EHS
Mr.Sharma / Mr.Jain
No TargetYesNo00YesYes
PP-0205DocumentationPilot plantArea & GMP LayoutPrepare personnel entry/exit movement flowClosedCriticalEngineering / QA / EHS
All Departments
No TargetYesNo00YesYes
PP-0208QualificationPilot plantP&ID / As-built Drawing PackCompile approved P&IDs and as-built utility/equipment drawingsNot StartedHighEngineering
Mr.Sharma
No TargetNoNo00NoYes
PP-0209QualificationPilot plantVendor Documentation PackCollect vendor manuals, MOCs, certificates and commissioning checklistsNot StartedHighEngineering
Mr.Sharma Ji / Vendor
No TargetNoNo00NoYes
PP-0211QualificationPilot plantLeak / Pressure Test RecordsCompile leak test, pressure test and vacuum hold recordsNot StartedHighEngineering / QA
Mr.Sharma Ji / Mr.Jain Ji
No TargetNoNo01NoYes
PP-0212QualificationPilot plantIQ ProtocolsPrepare IQ protocols for all critical equipment and utilitiesWork In ProgressCriticalQA / Validation
Amir Tanks
No TargetNoYes10NoYes
PP-0213QualificationPilot plantOQ ProtocolsPrepare OQ protocols for all critical equipment and utilitiesNot StartedCriticalQA / Validation
Mr.Jain
No TargetNoNo00NoYes
PP-0214QualificationPilot plantSOP PackPrepare SOPs for operation, cleaning, safety and emergency handlingNot StartedHighProduction / QA / EHS
Mr.Jain Ji
No TargetNoNo00NoYes
PP-0215QualificationPilot plantPM PlanCreate preventive maintenance plan and lubrication checklistNot StartedHighEngineering
Mr.Sharma
No TargetNoNo00NoYes
PP-0216QualificationPilot plantOperator TrainingComplete operator and maintenance team trainingNot StartedHighProduction / Engineering / QA
Mr.Jain / Mr.Bagal
No TargetNoNo00YesYes
PP-0217QualificationPilot plantPSSR / Final Safety ClearanceComplete pre-startup safety review and final EHS clearanceNot StartedCriticalEHS / Engineering / Production
Mr.Jain / Mr.Bagal / Mr.Vishal
No TargetYesNo00YesYes
PP-0218QualificationPilot plantOperational HandoverConduct final QA/Engineering/Production handover and ready-to-operate approvalNot StartedCriticalManagement / QA / Production / Engineering
Mr.Jain / Mr.Sharma / Mr.Bagal
No TargetYesNo00YesYes
PP-0220Procurement / VendorPilot plantCentrifugesFinalize installation plan and vendor resource for centrifugesClosedCriticalEngineering / Production
Mr.Sharma
No TargetYesNo00YesYes
PP-0221DocumentationPilot plantDependency MapComplete dependency mapping and downstream impact reviewWork In ProgressCriticalEngineering / Project Lead
Nick
No TargetNoNo00YesYes
PP-0222EquipmentIntermediate / Clean roomCentrifuge 1Verify Centrifuge 1 received at siteClosedHighEngineering
Mr.Siva
No TargetNoNo00NoNo
PP-0227EquipmentIntermediate / Clean roomCentrifuge 2Verify Centrifuge 2 received at siteClosedHighEngineering
Mr.Siva
No TargetNoNo00NoNo
PP-0232EquipmentIntermediateSifterVerify Sifter received at siteClosedHighEngineering
Mr.Siva
No TargetNoNo00NoNo
PP-0234Electrical / InstrumentationIntermediateSifterComplete electrical connection, earthing and safety interlock check for SifterClosedCriticalElectrical / Instrumentation
Mr.Sharma
No TargetYesNo00YesYes
PP-0237EquipmentIntermediateMulti-millVerify Multi-mill received at siteClosedHighEngineering
Mr.Sharma Ji / Vendor
No TargetNoNo00NoNo

Imported columns supported: 31. Closed and qualified tasks remain visible unless an open-only filter is selected.